翻訳と辞書
Words near each other
・ Upper Wade and Curtis Cabin
・ Upper Walthamstow
・ Upper Wardha Dam
・ Upper Warlingham railway station
・ Upper Washabuck, Nova Scotia
・ Upper Waterhay Meadow
・ Upper Weald
・ Upper Wedgeport, Nova Scotia
・ Upper Weeks Falls
・ Upper Silesian
・ Upper Silesian Coal Basin
・ Upper Silesian Ethnographic Park
・ Upper Silesian Industrial Region
・ Upper Silesian metropolitan area
・ Upper Silesian Offensive
Upper Silesian Railway
・ Upper Similkameen Indian Band
・ Upper Sind Frontier District
・ Upper Sinjol
・ Upper Sioux Agency State Park
・ Upper Sioux Indian Reservation
・ Upper Skagit Indian Tribe
・ Upper Slaughter
・ Upper Smithfield, Nova Scotia
・ Upper Smoky Dome Lake 1
・ Upper Smoky Dome Lake 2
・ Upper Snyder Lake
・ Upper Soda Springs
・ Upper Sorbian language
・ Upper Sorbian phonology


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Upper Silesian Railway : ウィキペディア英語版
Upper Silesian Railway

The Upper Silesian Railway ((ドイツ語:Oberschlesische Eisenbahn), OSE, (ポーランド語:Kolej Górnośląska)) was one of the earliest railways in Silesia, and the first in the territories of partitioned Poland. It connected Wrocław (Breslau) in Lower Silesia with Mysłowice (Myslowitz) in Upper Silesia. The first section was opened in 1842 and the last in 1846, after which it ran until merged into the Prussian state railways in 1883.
==History==
First plans for a railway in Upper Silesia date to the early 19th century, but the construction work began only in 1841. The railway was built by the ''Oberschlesische Eisenbahn AG'' (OSE), a private company, with support from the Prussian government.〔 Operated by the OSE, the Upper Silesian Railway (''Oberschlesische Eisenbahn'') was the first railway line in Poland, situated in the Prussian partition of the partitioned Polish territories. In 1842 it extended from Wrocław via Oława to Brzeg.〔 The train from Wrocław to Oława on 1 May 1842, the first section of the Upper Silesian Railway to be opened, was also the first train ride within the borders of modern Poland.〔 By August that year it reached Brzeg, and by 29 May next year, Opole.〔 The construction slowed afterward and the next section, to Gliwice, was opened on 2 November 1845, reaching Świętochłowice later that month.〔 In the years thereafter it was steadily expanded until it reached Katowice and Mysłowice by 3 October 1846, by which time the line was declared complete.〔 At that time the line was long, and its tracks spanned 104 new bridges.〔
The line significantly shortened travel times in Upper Silesia: the trains, travelling at 30-40km/h, took between 5 to 7 hours to traverse the route, while stage coaches took several days.〔 The transport was also much faster than that on the Silesian waterways, and already by 1847 it is estimated that the bulk cargo moved by the railway equalled that moved by roads and waterways.〔
The Upper Silesian Railway was connected to Frankfurt an der Oder by 1 September 1846 through the Lower Silesian-Mark Railway line, which gave access to Berlin.〔 Shortly afterward, on 1 September 1848, OSE was connected to the Austrian Kraków and Upper Silesian Railway and by 13 October that year, the international Warsaw–Vienna railway.〔〔 This was the first railway connection between Berlin and Vienna, also linking the two (at that point, both former) Polish capitals of Kraków and Warsaw.〔
The OSE company was nationalized by Prussia in 1857, as the German government wanted to fix the prices at a low level to speed up the region's industrialization.〔 The company was eventually merged into the Prussian state railways in 1883.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Upper Silesian Railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.